Shading Poles

Shading Poles in a Summer House in Antiparos Island.

poles σκίασης – shading poles
poles σκίασης – shading poles
poles σκίασης – shading poles

RAIL SYSTEM FROM IMPERTEK

Impertek from Italy has presented us at our showroom, the new “RAIL SYSTEM”.

Prefabrication of pergola project

Prefabrication of pergola project with laminated western red cedar beams and hidden fixings.
Shortly, new photos on site after installation.

ξυλινη-περγκολα-απο-δυτικο-δυτικο-κοκκινο-κεδρο-προκατασκευη-western-red-cedar-pergola-project
ξυλινη-περγκολα-απο-δυτικο-δυτικο-κοκκινο-κεδρο-προκατασκευη-western-red-cedar-pergola-project

OUR NEW SHOWROOM

PERGOLA IN RESIDENCE IN PAROS

In the context of its close collaboration with ISV, assiourasbros undertook the commissioning and placement of pergolas at a residence in the rapidly developing island of Paros. A project of great scope, of increased technical requirements as the traditional-modern dipole had to be in full harmonization. Photos George Labropoulos, Ioanna Nicolaireizi

PERGOLA-
PERGOLA
PERGOLA

COCO-MAT ATHENS JUMELLE

Assiourasbros has signed upon the completion of the renovation of COCO-MAT ATHENS JUMELLE hotel. The architectural study implements a common vocabulary , trademark of COCO-MAT , with sliding shading panels whose assiourasbros undertook commission and placement . A special touch is the construction of the waterfall. Western Red Cedar , offers the construction a perfect aesthetic result due to its mild coloration while at the same time endures the strength , because of its resistance to atmospheric pollution.

FACCADE-SLIDING-PANNELS-WESTERN-RED-CEDAR
FACADE-SLIDING -PANELS-WESTERN-RED-CEDAR
WESTERN-RED-CEDAR-SINGLES

INTERIOR FLOOR & DECK IN RESIDENCE IN PELOPONNESE

Assiourasbros has completed  with total  success the supply and installation of wooden interior floors and external deck of Iroko timber , in residence in the Peloponnese. A particularly demanding project in terms of size , since the surface coverage exceeded the 600 square meters of Iroko timber , as well as the technical particularities . Nowadays , eight months later of the completion of the project , the deck has not suffered any damage despite the constant exposure to weather conditions. This project achieved absolute alignment with the architectural design, promoting a perfect aesthetic result.

DECK-IROKO
DECK-IROKO
DECK-IROKO